This blog was created to memorialize the building process of my Van's Aircraft RV-14 and to satisfy the requirements for certification in the Experimental Amateur Built Aircraft category. It will also serve as a central location for ME to reference in the future on processes and techniques I used during the build. Additionally, it will allow my family, friends, and other interested builders the opportunity to follow along during my build…..and might be helpful to someone along the way.

Thursday, December 19, 2024

RV Max Flap Actuator - PH Aviation Services (Part 4)

›
In the previous post, the actuator was installed in the RV - minus the electrical connections.  In this work session, I completed all the ap...
Monday, May 6, 2024

Sunspot 36 LX (Leading Edge Landing Lights) - AEROLED’s (Part 2)

›
The install of the leading edge landing lights (taxi lights for my plane - see Part 1) was pretty straight forward and only took about 30 mi...
Wednesday, March 27, 2024

Finishing, Cowl Baffle (Part 10)

›
The work and picture in this post is from July 2, 2023. Well, I waited long enough from the last work session to fabricate the two CB-00025 ...

Finishing, Cowl Baffle (Part 9)

›
The work and pictures in this post are from October 12, 2021. One of last aluminum pieces of the Baffling to be prepared and installed is th...
Tuesday, March 26, 2024

Finishing, Cowl Baffle (Part 8)

›
The work, pictures and video in this post are from October 11, 2021. This is the Left FWD Assembly installed on the engine.  Van’s did a gre...

Finishing, Cowl Baffle (Part 7)

›
The work and pictures in this post are from September 30, 2021. Alright, AGAIN!…..I didn’t take any pictures of this before I riveted it tog...

Finishing, Cowl Baffle (Part 6)

›
The work and pictures in this post are from September 28, 2021. Below is the completed CB-00007 Right Air Ramp.  I also forgot to take pictu...

Finishing, Cowl Baffle (Part 5)

›
The work and pictures in this post are from September 27, 2021. After all the RTV dried, I installed the Left and Right AFT Baffle Assemblie...

Finishing, Cowl Baffle (Part 4)

›
The work and pictures in this post are from September 25, 2021. The CB-00004 FWD Center Bracket and the CB-00016 AFT Center Bracket are show...
Monday, March 25, 2024

Finishing, Cowl Baffle (Part 3)

›
The work, pictures and video in this post are from September 24, 2021. This is the Right AFT Baffle Assembly and is made up of three separat...

Finishing, Cowl Baffle (Part 2)

›
The work, pictures and video in this post are from September 23, 2021. All the parts and pieces in this section were treated with alumiprep,...
Sunday, March 24, 2024

Fuselage, Rollover Structure (Part 9)

›
The work and pictures in this post are from August 4, 2020. The last step in closing out this section is installing the F-14125-R & -L S...

Fuselage, Rollover Structure (Part 8)

›
The work and pictures in this post are from August 3, 2020. After all those rivets were installed, I used my gray SEM to paint the rivets.  ...
›