Another short session tonight, but progress is progress. During the last session, I primed the Muffler Shroud Doublers. Tonight, I riveted them to the Muffler Shroud Sides. The first picture shows both sides of the Shrouds with the Doublers riveted into place using AN426AD3-3 rivets. The second is a close up of the same.
Lastly, I primed the Muffler Hanger Angles. Because the two Angles are steel and the Shroud Sides they attach to are Stainless Steel, I wanted to provide some corrosion protection. These Angles will be attached in the three holes in the center of the Doublers shown in the two pictures above.
