Monday, September 9, 2019

Fuselage, FWD/MID Side Structure (Part 3)

Tonight was a pretty short session.  I started out by cleaning the edges of the Center Section Side Panels.  Once that was complete, I treated the Side Panels, Lower Drag Fittings, and Upper Drag Fittings with Alumiprep and Alodine.  I will let them dry overnight and Akzo prime them tomorrow.