As described in yesterday’s post, 23 parts/pieces were Akzo primed and allowed to dry overnight. I started tonight by numbering each of the Wing Ribs as I took them off the “clothesline” (you can see Ribs #1 and #2 marked below). I also installed the 29 plastic Snap Bushings.
Next, I assembled and riveted the Torque Tube Support Bracket Assembly together. Here are the five pieces that make up the assembly.
Here is the assembly after being riveted together. This is the manufactured head side.....
And the shop head side.
More tomorrow.....