Tuesday, December 31, 2019

Fuselage, Aft Fuselage Attachment (Part 1)


While waiting on some riveting help, I decided to move on to the next section and start preparing some parts.  As the section is titled, Aft Fuselage Attachment, there are only be a few parts that need to be prepared....the focus of the section is connecting the two “halves” of the Fuselage together.

The first two pieces to be prepared are the F-01406A-L & -R Bulkheads.  The picture below shows the two completed parts.  Each part had the holes deburred, edges cleaned, appropriate #40 and #30 holes dimpled, treated with Alumiprep, treated with Alodine and Akzo primed.  The next step is to install the required nutplates.

The next part to get prepared is the F-01406C Bulkhead (top piece).  This part was prepared in the same manner as the two Bulkheads above.  Additionally, the two F-1231D Roll Bar Bases (to be used in Section 29) were treated with Alumiprep, Alodine and Akzo Primer.