As I mentioned in the last Outboard Leading Edge Post (Part 25), the J-Stiffeners needed to be prepared prior to installation. During today’s session, the J-Stiffeners were treated with Alumiprep, Alodine, and Akzo Primer. The picture below show the two Stiffeners drying after being primed.
Pictured below in the Right Outboard Leading Edge with the primed J-Stiffener clecoed into place. I also painted flat black the section of the J-Stiffener that extends into the Landing Light Bay. The Left Outboard Leading Edge was prepared in the same fashion.
The two J-Stiffeners (one for the Right Outboard Leading Edge Skin and one for the Left Outboard Leading Edge Skin) will be riveted into place tomorrow.