During today’s session, we also riveted the J-Stiffeners in both Outboard Leading Edges. Each J-Stiffener received 62 rivets. Below is a picture of the Left Outboard Leading Edge with the J-Stiffener riveted into place (horizontal row across the top).
This is the inside of the same Leading Edge and you can also see the J-Stiffener riveted into place. As I mentioned in a previous post, the portion of the J-Stiffner in the Landing Light was painted flat black....the remainder of the J-Stiffener is in Akzo green.
*****125 Rivets Installed*****