The 12 Outboard Leading Edge Ribs were treated with Alumiprep and Alodine during today’s work session. The six Ribs on the left are for the Left Outboard Leading Edge and the six on the right are for the Right Outboard Leading Edge. I used the same dipping method as I have for all the Ribs up to this point and they are now hanging up to dry overnight.
I will begin Akzo priming during the next session.