After preparing parts during the previous session, today I treated them with Alumiprep, Alodine and Akzo Primer. After they dried, I installed the eight K1000-06 nutplates on the two W-00016B AEROLED’s Sun Spot LX Brackets using AN470AD3-3 rivets (easily hand squeezed).
Lastly, I sprayed them with flat black paint. They are now ready to be installed with the landing light (during a later session).