The work for this session was actually completed on Saturday, March 24th.
I treated the “inside” of the Skins with Alumiprep and Alodine using spray bottles and foam brushes. On the “outside” of the Skins, I lightly buffed the rivet lines with grey Scotchbrite. After the Skins were sufficiently dried, I sprayed Akzo primer on the entire inside of the Skin and the rivet lines on the outside.
Here is the “inside” of the Top Inboard Wing Skin.....
.....and the rivet lines on the “outside”.
This is the “inside” of the Top Outboard Wing Skin.....
.....and the rivet lines on the “outside”.
Lastly, here are the two Wing Walk Doublers for the Right Wing.
Now that these steps are completed and the Skins have been primed, I will cleco them to the Right Wing and begin the riveting process. At this point, each of the Wings will receive 788 rivets.