I actually started work on this session yesterday, but finished up early this morning. I was just about to cleco the Front Spar into the Horizontal Stabilizer assembly for the final time. BUT prior to that, I needed to install the last 18 rivets (9 on the top and 9 on the bottom) in the right side of the Front Spar assembly. The remaining rivets will be installed in where the clecos are located in the picture below.
Once that was completed, I installed the Front Spar into the Horizontal Stabilizer assembly and clecoed it to all the Inspar Ribs and Skins. Once in place, the six nose Ribs where riveted to the leading edge of the Skins.