Tuesday, February 5, 2019

Wings, Flaps (Part 25)

This session was completed on Monday, February 4, 2019

I let the Akzo Primer dry overnight and the parts of the Right Flap are now ready to be assembled.  Below, are the Nose Ribs, Doublers, and Hinge Brackets.

Here are the Hinge Brackets and Nose Ribs riveted together using AN470AD4-4 universal rivets.  Also shown below are Nose Ribs and Doublers riveted together....also using AN470AD4-4 universal rivets.

After the Nose Ribs and Hinge Brackets were riveted together, the two halves now need to be riveted together.  The eight rivets in the middle of the Brackets are set double flush.

Lastly, the Nose Ribs, Main Ribs, Modified Main Rib, Inboard and Outboard Rod End Ribs, and Hinge Pair Subassemblies were clecoed to the Spar.  I will start riveting the assembly together during the next session.