The work, pictures and video in this post are from September 23, 2021.
All the parts and pieces in this section were treated with alumiprep, alodine and Akzo primer. Additionally, I painted them with a silver epoxy paint (since they were going around the engine).
Below is the CB-00003 Cylinder #1 Baffle and the CB-00002 Forward Doubler before they were riveted together.
This is the CB-00001 Cylinder #2 Baffle. It has already been riveted to the CB-00002 Forward Doubler.

Here is the CB-00014 Cylinder #3 Baffle. It has already been riveted to the CB-00002 Forward Doubler.

Lastly, here is the CB-00019 Cylinder #4 Baffle. It also has the CB-00002 Forward Doubler riveted to it.
Below are three pieces…..the CB-00028 Cylinder #3 Bridge, CB-00029 Cylinder #3 Bridge Left and CB-00030 Cylinder #3 Bridge Right…..all riveted together.
