Tonight was a relatively short session. I only installed 42 CS4-4 rivets (22 on each Fairing); however, completed the Fairing installation on the left and right Elevators.
This is the top of the right Elevator with the rivets installed.....
.....and the bottom of the right Elevator.

This is the top of the left Elevator with the rivets installed.....

.....and the bottom of the left Elevator.
