Sunday, July 16, 2017

Empennage, Aft Fuselage (Part 15)

Another very productive day at the hangar.  I started today by installing the nine K1000-08D and two MS21055L08 (90 degree angled) nutplates to the F-01406B Bulkhead.  Both types of nutplates accepted AN426AD3-3.5 flush rivets.  The nutplates near the top edge of the Bulkhead were set with the hand squeezer.  However, I need the pneumatic squeezer with the 3" yoke to reach the three in the middle. 

 After the nutplates were riveted, the F-01429-L & -R Bellcrank Ribs were riveted to the Bulkhead.  The assembly used eight AN470AD4-4 universal rivets and two AN426AD4-4 flush rivets.

Next, all of the #40 holes in the F-01478 Bottom Skin were dimpled with the DRDT-2.  I also completed all the edge work on the Bottom Skin.  Here are a couple shots of the completed Skin.