Saturday, March 21, 2020

Fuselage, Upper FWD Fuselage (Part 2)

Here are the parts that will get prepared during today’s session.  

1.  F-01493 FWD Fuselage Channel (the part at the top)
2.  F-01459-L & -R Canopy Hinge Ribs (had to be separated)
3.  C-01436 Pivot Block Channel
4.  F-01462A Canopy Hinge Doubler (x2)
5.  F-01462B Canopy Hinge Doubler (x2)

Done!  All of the prep work has been completed on the parts listed above.  All parts were separated (if needed), had the edges cleaning, holes deburring and dimpled (if required).  All of the parts are now ready to be treated with Alumiprep, Alodine and Akzo primer. 

In the picture below, I also include the parts that were prepared during he last session.