Not much to show during today’s work session. I countersunk the 11 #40 holes in the two F-01462A Canopy Hinge Doublers and the eight #40 holes in the two F-01462B Canopy Hinge Doublers. Then, all the parts and pieces prepared in Parts #1 and #2 were treated with Alumiprep and Alodine. I’ll let everything dry overnight and spray them with Akzo Primer during tomorrow’s session.