Finishing, Tail Dragger Landing Gear and Engine Mount (Part 2)

This work session was completed on April 27, 2021.

The Finishing Kit arrived on October 26, 2020; however, the engine mount was unfortunately on backorder.  On April 26, 2021, the engine mount FINALLY arrived.....ironically, it was exactly 6 months!  The engine mount arrived screwed to this sheet of plywood in a big cardboard box.

The first step was to install the two FLF-00010 Flanged Couplings on the Firewall.  These Couplings will be used for the hydraulics lines down to the wheel brakes.  After that, six AN6 bolts of various lengths will be used to attach the engine mount to the Firewall has described below.

(Excerpt from the Van’s RV-14 Builder Plans)

Here is the engine mount final installed to the Firewall.  This view if from the right side.....

.....straight on.....

.....and the left side.  The gear can now be installed during the next session.