This work session was completed on November 25, 2020.
These are the F-14122A Root Fairing Stiffeners (left column for the left side and right column for the right side). They came from Van’s in two long strip and each Stiffener had to be separated and “shaped”. These are the completed Stiffeners after being separated, “shaped” and dimpled.....
.....and after being treated with Alumiprep, Alodine and Akzo Primer. They are now ready for installation.